Hampton by Hilton
Stansted Airport, Essex, 2017
Stansted Airport, Essex, 2017
Project Value: 27 million
Space: 8670 square meter A hotel development of 357 bedrooms and parking located within the grounds of Stansted airport. The roof plant is enclosed using an aluminum louvre screen supported on steel frame. |
|
Westminster Quarter
London, 2017
London, 2017
Project Value: 35.5 million
Space: 340 square meter A design and build construction of a five and eight storey residential units and commercial space at ground level with car parking at basement level. A fire rated louvre supported on a galvanised steel frame in used in the design providing 60 minutes fire rating. |
Findlater House
Dublin, 2016
Dublin, 2016
Project Value: 12 million
Space: 198 units The project involves the conversion of the existing Findlater House office block to a 198 bed new generation Holiday Inn Express Hotel with coffee shop on the ground floor. The plant on the roof is concealed from view through hotel apartment windows using louvre screens supported on steel posts and beams. |
Mercia EnviRecover EFW
Worcestershire, 2017
Worcestershire, 2017
Space: 8.4 acres plot
Energy: 16MW exported to grid In May 2014 work started on the construction of EnviRecover. It is a 200,000 tonne per year Energy-from-Waste facility at the Hartlebury Trading Estate. Expected electricity export to the grid will exceed 16MW, after plants use of energy. Greenwood louvre screen is used to conceal the visibility of the pipe bridge on the site. The louvres were fixed to the steel frame pipe bridge. Technical drawing files can be viewed via link. |
|